CASE STUDY | Cloud Connectivity
Unblocking a Stalled Application Release in Two Days
How Nubius connected a SaaS application to Google Cloud after three weeks of delays.
3 weeks
application delivery blocked before Nubius engaged
2 days
to establish working Google Cloud connectivity
AWS Next
customer returned for another cloud connection.
Customer: A growing SaaS company operating across on premise systems, Google Cloud, AWS and private clouds.
Need: Secure connectivity for an application preparing for a major release.
Nubius role: Network design and implementation alongside the development and infrastructure teams.
The Situation
A growing software company was preparing a major application release, but one infrastructure dependency had stopped progress. The application needed a secure connection to Google Cloud. After three weeks, that connection was still unavailable and the application remained blocked for release.
The Challenge
The company already operated across on-premises infrastructure, Google Cloud, AWS and private clouds. The new connection had to fit that mixed environment while maintaining separation between networks and controlled access to the application systems.
The internal networking team had the capability to tackle the work, but was managing a heavy ticket load, parallel projects and ongoing operational issues. The immediate problem was finding time to work through Google Cloud routing and connectivity requirements while the application deadline approached.
Routing the new connection through the core firewalls was possible, but would have introduced a different delay. Those devices served as the main entry point to the data center, so changes would require a global maintenance window. Nubius advised against making the application release dependent on that wider infrastructure change.
How Nubius Delivered
Understand the dependency
Within hours of being contacted, Nubius brought the developers and infrastructure staff into a joint discussion. This allowed the team to address the application’s access requirements and the operational constraints together, rather than treating the connection as an isolated networking ticket.
Build a separate connection
The team deployed OPNsense firewalls on premises and connected their interfaces to the required internal subnets. Encrypted IPsec tunnels provided the connection to Google Cloud. BGP routing allowed routes to be exchanged dynamically rather than relying on a collection of manually maintained static routes.
Maintain routing control
The team also configured internal BGP on the application virtual machines to maintain segmentation and routing control. The resulting design provided the required connection without modifying the central firewalls or waiting for a global maintenance window.
Return the work to delivery
This was a focused engineering engagement alongside the existing team. The work addressed the blocked dependency and respected the wider environment’s change restrictions, allowing the internal staff to continue managing their other responsibilities.
The Results
By the second day, the application could access the required Google Cloud services through secure routing, and the developers were unblocked. A problem that had held up delivery for three weeks was resolved without requiring the internal networking team to abandon its other work.
A few weeks later, another product needed a secure connection to AWS. The company returned to Nubius for that work. The follow-on request extended the relationship beyond the original problem and provided a practical indication that the first engagement had met the team’s needs.
| Area | Before | After |
|---|---|---|
| Application delivery | Blocked by an unavailable Google Cloud connection | Developers unblocked by day two |
| Change requirements | Core firewall changes would require a global maintenance window | Separate firewalls connected the application without modifying the core devices |
| Internal capacity | Networking staff managing tickets and competing projects | Nubius completed the focused connectivity work alongside the team |
The Bigger Picture
An overloaded infrastructure team can hold up a release even when the application itself is ready. This engagement shows how focused outside engineering support can resolve a specific dependency while respecting the existing team and the wider environment.
Let’s Talk
If a cloud connection or infrastructure task is holding up progress, Nubius can review the requirements with your team and help identify a practical way forward.